Ground Survey for Detailed Design of Gwangju-Gangjin Highway Construction (Section 4) (Stage 2)
2016.06.10 ~ 2022.12.29
Description: This project aimed at collecting and reviewing all the geotechnical data for the foundation of the structure, the tunnel, and earthworks, by grasping the ground condition of the planned route of "Gwangju-Gangjin Highway Construction Ground Survey Service for Detailed Design (Section 4)". Ultimately, the project was to secure the earthwork, structures, and pavement materials on the planned roads and judge whether the quality is appropriate.